One shift workspace, from field notes to signed handover
Start the shift, log what happens as it happens, walk the inspection against the site’s own checklist, and hand over with a record both supervisors have signed. Built for a supervisor’s thumbs on a phone or an iPad in the pit.
Nothing is assumed
Items remain visibly unanswered until a supervisor records a response. Concerns require a comment and can create a tracked action.
- Original notes remain visible
- Inspection status is explicit
- Actions retain owner and due date
- Final report requires sign-off
Site setup
Pick the site. Its fleet, dumps and material come with it, so nothing here gets typed twice.
Notes and shift diary
Log things as they happen. The diary goes out with the handover, so the oncoming crew reads when, not just what.
Rough shift notes
Record a shift summary
Tap to start. Audio remains in this browser session in the prototype.
Production rule: reports will only use reviewed transcript text or explicitly completed form fields.
Pre-shift and communications
Capture the shift rating, critical communications and previous-shift issues.
How was the last shift rated?
Items discussed or handed over
Supervisor pit inspection
Record each item as satisfactory, concern or not applicable. Concerns require supporting detail.
Production and equipment
Digitised from the pilot site’s dig-unit and material movement summaries.
Dig-unit downtime and delay summary
| Equipment | Down at | Reason | Online at |
|---|
Bucket timeline summary
| Equipment | 1st bucket start | Last bucket before crib 1 | 1st bucket after crib 1 | Last bucket before crib 2 | 1st bucket after crib 2 | Last bucket end shift |
|---|
Dig-unit performance summary
| Equipment | Start SMU | End SMU | Coal loads | NAF loads | PAF loads | Coal BCM | Waste BCM | Rate BCM/h |
|---|
NAF dumping summary
| Equipment | From RL | Cover class | Haul to cell | Dump zone |
|---|
Mining shift handover
Consolidate the operational position for the incoming supervisor.
Handover checks
Shot status
Sketch or diagram
Use a mouse, stylus or finger. The sketch is stored with this local draft.
Corrective actions
Concerns from the inspection appear automatically. Add any further handover actions below.
Open and completed actions
Evidence register
Attach evidence to the operational area it supports. Entries are included in the printable report.
Shift evidence
Use photos for the dig floor, dump, inspections, production events, handover, or actions. Images are limited to 3 MB each for local storage.
Review, acknowledge and export
The report below is assembled from what was recorded on the shift, nothing added. No AI service is connected.