Start here

One shift workspace, from field notes to signed handover

Start the shift, log what happens as it happens, walk the inspection against the site’s own checklist, and hand over with a record both supervisors have signed. Built for a supervisor’s thumbs on a phone or an iPad in the pit.

Pilot workflow

Capture once, use throughout the shift

1Set up shiftDate, crew, supervisors and operational context
2Capture notesTyped notes and a running shift diary
3Inspect and recordSite checklist, defects and corrective actions
4Record performanceDig units, dozers, material movement and delays
5Review and signHandover summary, actions and acknowledgements
Safety control

Nothing is assumed

Items remain visibly unanswered until a supervisor records a response. Concerns require a comment and can create a tracked action.

  • Original notes remain visible
  • Inspection status is explicit
  • Actions retain owner and due date
  • Final report requires sign-off
Step 1

Site setup

Pick the site. Its fleet, dumps and material come with it, so nothing here gets typed twice.

Step 2

Notes and shift diary

Log things as they happen. The diary goes out with the handover, so the oncoming crew reads when, not just what.

Original input

Rough shift notes

Voice

Record a shift summary

Ready
00:00

Tap to start. Audio remains in this browser session in the prototype.

Production rule: reports will only use reviewed transcript text or explicitly completed form fields.

Step 3

Pre-shift and communications

Capture the shift rating, critical communications and previous-shift issues.

Previous shift

How was the last shift rated?

Communications

Items discussed or handed over

All items require a response
Step 4

Supervisor pit inspection

Record each item as satisfactory, concern or not applicable. Concerns require supporting detail.

Step 5

Production and equipment

Digitised from the pilot site’s dig-unit and material movement summaries.

Events

Dig-unit downtime and delay summary

EquipmentDown atReasonOnline at
Timeline

Bucket timeline summary

Equipment1st bucket
start
Last bucket
before crib 1
1st bucket
after crib 1
Last bucket
before crib 2
1st bucket
after crib 2
Last bucket
end shift
Performance

Dig-unit performance summary

EquipmentStart SMUEnd SMUCoal loadsNAF loadsPAF loadsCoal BCMWaste BCMRate BCM/h
Material control

NAF dumping summary

EquipmentFrom RLCover classHaul to cellDump zone
Step 6

Mining shift handover

Consolidate the operational position for the incoming supervisor.

Required discussion

Handover checks

Blasting

Shot status

Additional notes

Sketch or diagram

Use a mouse, stylus or finger. The sketch is stored with this local draft.

Step 7

Corrective actions

Concerns from the inspection appear automatically. Add any further handover actions below.

Action register

Open and completed actions

Step 8

Evidence register

Attach evidence to the operational area it supports. Entries are included in the printable report.

Photos and notes

Shift evidence

Use photos for the dig floor, dump, inspections, production events, handover, or actions. Images are limited to 3 MB each for local storage.

Step 8

Review, acknowledge and export

The report below is assembled from what was recorded on the shift, nothing added. No AI service is connected.